Hamilton
Landing in Novato, A restoration of existing aircraft hangers into office
spaces. Progress Glass was hired by Devcon construction to install new painted
curtain wall, aluminum doors and sun coated tinted insulated glazing. Progress
Glass fabricated the curtain wall’s in our Cotati facility the average height
of the mullions on the ends of the hangers are over 25’ long. These mullions
are steel reinforced inside. Progress Glass partnered with Sheedy Crane
(located in San Francisco) to help lift and install the mullions as well as the
glass using a powered glass cup machine. The curtain wall and door’s came from
Arcadia Inc.